Incorporated in 2012, JEPL has initiated a number of Projects at different levels in various fields.
Promoters of JEPL, in their individual capacity, have successfully participated / completed a number of Projects. Following is the list of some of such Projects:
- Independent Consultancy Services for 6- Laning of Jaipur Kishangarh Section of NH-8 on BOT basis.
- Supervision Consultancy Services for 4-Laning of Ambala-Sirhind Section of NH-1.
- Quality Assurance and Technical Audit of World Bank funded Gujarat State Highways Project.
- Supervision Consultancy Services for Widening of State Roads In Gujarat.
- Construction of Institutional Area Phase-II (Roads) Noida.
- Construction of World Bank funded State Highway 16 in Rajasthan.
- Manufacturing and laying of high pressure Pre-Stressed-Concrete (PSC) water supply pipe line in Chandigarh.
- Six Laning of Gurgaon-Jaipur Section of NH-8.
- Operation and Maintenance of Jaipur Kishangarh Section of NH-8 on BOT basis.
- Construction & Supervision of Kishangarh to Ratangarh- Mega Highway Project (HK-2) in Rajasthan.
- Operation & Maintenance of NH-8 from Km 42+000 to Km 248+000 (Haryana & Rajasthan Section).
- Construction & Supervision of Sikar –Jhunjhunu – Loharu on State Highway No. 8 on BOT basis.
- Construction & Supervision of NH-8 from Km 222+000 to Km 254+000 (Zone D section of Chandwaji to Harmara).
- Highways design of Four Laning of NH-6 from Km 75+940 to Km 133+000 In Gujrat State.
- Highways design of Six Laning of Kishangarh-Biawar section of NH-8 in the state of Rajasthan.
- Highways design of Six laning of Four lane Nh-2 in the state of Uttar Pradesh and Bihar from Varanasi to Aurangabad (Km 871 to 978.400).
- Highways design of Four/ Six Laning of Delhi Border to Rohtak of NH-10 including Bahadurgarh and Rohtak Bypass.
- Highways design of Four Laning of Muzaffarnagar Haridwar section of NH-58 in the state of U.P. and Uttarakhand.
- Highways design of Four laning of Nh-58 and Nh-72 in the state of Uttarakhand from Haridwar to Dehradun.
- Strengthening and four laning of NH 45B from Tiruchirapalli to Maduraj in the state of Tamilnadu.
- Jharkhand Bridge DPR (Rural Roads) Preparation of design of 70Nos. Bridges in six districts – Bokaro, Hazaribagh, Ramgarh, Simdega, Chakardharpur and Deogarh Total Bridge Length – 4550m
- Bridge Components –
- • Superstructures - RCC T-Beams and RCC Solid slabs.
- • Substructure Type – RCC Wall type Abutments, RCC Circular and wall type Piers.
- • Foundation - Open and Pile foundation.
- Design of Cross-drainage structure (CPWD Delhi) Preparation of design of 54Nos. CD Structures for North-West Delhi Type of CD Structures – HPC and RCC Box Culverts
- Design of Vehicular and Pedestrian Underpasses (CPWD Delhi) Preparation of design of Underpasses with Ramps at approaches at Mansarovar and Dilshad Garden (Type of Structures – 3 VUPs and 1 PUP with ramp at approaches)
- Pre-Bid Project Dhar to Nagda (SH-31) MPRDC Project road starts from Dhar town and terminates at km 22.600 near 3-legged junction in Nagda Town Project Length – 22.600Km. The project is having one Minor bridge and 22 Nos. CD Structures
- Pre-Bid NH-12 Jhalawad to M.P. Border Project road starts from Jahalawad District and terminates at M.P. Border Project Length – 80km. The project is having a total of 79 structures existing structures – 2 Major Bridges, 7 Minor Bridges and 70 CD Structures with proposed structures as 31No. VUP, 3 Nos PUPs and 2 Nos Minor Bridges proposed.